The complete 2026 guide to understanding what a central kitchen is: legal definition (French decree of 21 December 2009 and EU hygiene package), three organisational models, ROI calculation, reinforced HACCP requirements, satellite allotment and ERP integration.
Run your central kitchen with Melba: industrial recipe specifications, production planning, multi-site allotment, downstream traceability and automated EU 1169/2011 allergen labelling.
A central kitchen, also called a central production unit or commissary kitchen, is a culinary production facility that prepares meals which are not consumed on site and are delivered to consumption points known as satellites. The French legal definition stems from article R. 233-4 of the rural code and the decree of 21 December 2009; the same operating concept is recognised across the European Union under the broader hygiene package. The qualification applies as soon as one production tool serves at least two distinct sites. The central kitchen concentrates purchasing, production, packaging and dispatch; the satellite handles reception, reheating and service.
The format has spread because it delivers three benefits at once: economies of scale on purchasing, standardised quality, and a lower kitchen wage bill on serving sites. It is widespread in institutional foodservice (Sodexo, Elior, Compass), commercial chains (Buffalo Grill, Pitaya, Class'Croute) and group hospitality (central pastry or bakery units). In return, a central kitchen imposes a stricter regulatory framework - sanitary approval, witness portions, forward flow design - and demanding cold-chain logistics.
What this guide covers
Free audit of your central kitchen project - Our team reviews your sizing, business plan and functional specification to identify risk areas and produce a realistic three-to-five-year ROI estimate.
Under French rural code article R. 233-4 and the decree of 21 December 2009, a central kitchen is an establishment whose output, in whole or in part, is destined to be delivered to another establishment or to a community of people. No volume threshold is set by regulation: the criterion is organisational, not quantitative. As soon as one tool serves at least two distinct sites, the qualification applies. The immediate consequence is that if the kitchen delivers to third parties, it must hold sanitary approval (CE approval number) issued by the DDPP under the supervision of the DGAL.
The European framework is set by the hygiene package: regulations EC 178/2002 (general principles), EC 852/2004 (food hygiene) and EC 853/2004 (specific rules for products of animal origin). These texts require a food safety management plan based on the seven HACCP principles, upstream and downstream traceability, and a general obligation to demonstrate control over biological, chemical and physical hazards.
Commercial, institutional and contract foodservice - A central kitchen can serve any of the three main segments. Commercial foodservice (restaurant chains, brasseries, fast-casual) requires EU 1169/2011 (FIC) compliance for allergen labelling; institutional foodservice (schools, care homes, hospitals, corporate canteens) adds the public procurement framework and nutritional quality decrees; contract foodservice (delegation to Sodexo, Elior, Compass) requires compliance with the customer's specifications. The legal status changes little - hygiene and traceability obligations remain the same.
The central kitchen handles the upstream flow: receiving raw materials, storing in cold rooms, large-batch production (kettles, sauteuse pans, mixed-mode ovens), rapid blast chilling (passing from 63 degrees to 10 degrees in under two hours for cook-chill), packaging in individual trays or bulk multi-portion containers, allotment by satellite, dispatch in refrigerated vehicles. It concentrates technical skills, purchasing power with suppliers and regulatory responsibility.
The satellite kitchen takes over downstream: receiving delivered goods, mandatory temperature checks on arrival, buffer storage in positive cold rooms, reheating for cook-chill (core temperature reaching 63 degrees in under one hour), service to the end consumer, waste handling and cleaning. The satellite does not produce, except in the hybrid model. Its team is smaller, less technical and focused on service.
Cook-chill vs cook-hot - Cook-hot requires holding above 63 degrees until service and consumption within two hours: rarely used because of logistics constraints. Cook-chill dominates in France (over 80 per cent of central kitchens): rapid chilling to 10 degrees in under two hours, storage at 0 to 3 degrees for 3 to 5 days, reheating at the satellite. It decouples production and service, allows logistics pooling and reduces sanitary risk if the cold chain is respected.
Choosing a model depends on the number of satellites, geographic spread, the customer experience targeted and the available capital budget. None is intrinsically better - each optimises a different trade-off between scale, freshness and resilience.
Observed use cases: pure central kitchen dominates in school and hospital catering; hybrid model dominates in premium restaurant chains; regional multi-CK dominates with the largest contract foodservice players.
A central kitchen org chart usually splits into three functions: management and quality (site manager, HACCP lead, purchasing lead), production (production chef, sous chefs, line cooks, packaging operators) and logistics (storekeeper, allotment operators, delivery drivers). The wage bill typically represents 14 to 18 per cent of kitchen revenue - lower than decentralised production thanks to per-station productivity gains.
Applicable collective agreements in France: institutional foodservice agreement (IDCC 1266) for institutional segments, HCR agreement (IDCC 1979) for commercial and hotel segments. Management status applies from production chef level upward.
A central kitchen concentrates sanitary risk because a single batch can be delivered to several hundred or thousand end consumers. The food safety management plan is therefore tighter than in standalone commercial kitchens: mandatory downstream traceability (ability to identify all satellites that received a batch from a specific raw material lot), systematic witness portions, kinetic temperature logging during chilling, periodic microbiological checks.
The guiding design principle is forward flow in time and space: goods never move backwards and dirty zones (reception, decartoning, peeling) are physically separated from clean zones (production, packaging, dispatch). This constraint shapes the architectural plan and conditions the granting of sanitary approval.
Allotment means assembling for each satellite the exact parcel matching its order: number of portions per dish, special diets (gluten-free, pork-free, blended), different consumption dates to optimise logistics. It is the most information-dense operation in a central kitchen and the most error-prone if handled manually.
Route optimisation: the HACCP delivery window is typically 4 to 6 hours (CK departure at 5am, last satellite reached before 11am for lunch service). Beyond that the cold chain is no longer guaranteed. Planning therefore needs to solve geographic constraints, refrigerated vehicle capacity and satellite reception slots simultaneously.
Comparison setup: a group with 10 sites x 200 covers per day, 250 opening days, totalling 500 000 covers per year. Average ticket 12 euros excluding tax, kitchen revenue 6 million euros excluding tax.
Decentralised: food cost 32 per cent (1.92 M euros), kitchen wage bill 22 per cent (1.32 M euros), waste 4 per cent (0.24 M euros). Direct cost total 3.48 M euros. Centralised: food cost 28 per cent thanks to purchasing power (1.68 M euros), kitchen wage bill 16 per cent thanks to productivity (0.96 M euros), waste 2 per cent (0.12 M euros), additional logistics 3 per cent (0.18 M euros), equipment and building amortisation 4 per cent over 7 years (0.24 M euros). Direct cost total 3.18 M euros.
A central kitchen cannot run on a generalist ERP such as SAP: recipe specification granularity is missing, native 14-allergen handling is absent, allotment by satellite has no metier equivalent, and integration with point-of-sale or operational tools is lacking. A modern CK relies on a foodservice-specialist multi-site ERP integrated with an HACCP management system and a logistics planning tool.
Required modules in the RFP: industrial recipe specifications (multi-portion, multi-recipe, sub-recipes), production planning (coupling satellite orders to stocks and cooking capacity), allotment (assembling parcels per satellite with automatic FIC labels), centralised multi-zone stock management, upstream and downstream traceability, food cost and COGS analytics per satellite, integration with POS and delivery platforms.
Seven mistakes account for most central kitchen project failures: undersized blast chillers (top HACCP non-conformity), centralising without investing in cold-chain logistics, manual FIC labelling, breaking forward flow at design, underestimating driver costs, running allotment on spreadsheets, no downstream traceability when a recall hits.
10-step project sequence: feasibility study, business plan and ROI, sizing (target volume, surface, equipment), site selection, architectural plans with forward flow compliance, sanitary approval request to DDPP, hiring of production chef and HACCP lead, equipment fit-out and dry runs, ERP rollout and integrations, progressive ramp-up site by site over 3 to 6 months.
A central kitchen is a culinary production facility that prepares meals which are not consumed on site and are delivered to consumption points known as satellites. The French definition stems from the decree of 21 December 2009 and rural code article R. 233-4. The qualification threshold is organisational: as soon as a kitchen produces for at least one other distinct site it qualifies as a central kitchen and must hold sanitary approval if it delivers to third parties.
The central kitchen produces, packages and dispatches - it concentrates purchasing, technical skills and regulatory responsibility. The satellite kitchen receives the goods (most often cook-chill), reheats and serves the end consumer. The satellite does not produce, except in the hybrid model with a la minute finishing, and its team is smaller and focused on service.
Regulation does not set a volume threshold but an organisational one. As soon as a kitchen produces for at least one other distinct site it qualifies as a central kitchen and must hold sanitary approval if it delivers to third parties (CE approval number issued by the DDPP under DGAL supervision). The economic break-even sits around 1 500 meals per day.
Cook-hot: consumption within 2 hours of production with holding above 63 degrees - rarely used. Cook-chill: rapid chilling to 10 degrees in under 2 hours, storage at 0 to 3 degrees for 3 to 5 days, reheating above 63 degrees at the satellite. Cook-chill dominates in France for logistics and HACCP reasons - it decouples production from service.
Building investment 800 to 2 500 euros per square metre depending on equipment, minimum profitable capacity around 1 500 to 2 000 meals per day, typical ROI 3 to 5 years for a chain of 10 or more sites versus decentralised production. As a benchmark: 5 000 meals per day requires around 700 to 1000 sqm and 1.5 to 2.5 million euros of equipment.
A foodservice-specialist multi-site ERP covering industrial recipe specifications, allotment, downstream traceability per satellite, temperature logs, centralised stocks and production planning. A generalist ERP like SAP lacks the metier granularity. Melba covers this scope natively.
French rural code article R. 233-4 and the decree of 21 December 2009 (French definition). EU hygiene package: regulations EC 178/2002, EC 852/2004 and EC 853/2004. Food safety management plan based on the 7 HACCP principles. EU 1169/2011 (FIC) compliance for allergen labelling. Sanitary approval mandatory if delivering to third parties - issued by the DDPP under DGAL supervision in France.